Section 1: Twelve LEED Rating Scenarios
TABLE 1-1: 12 LEED SCENARIOS (Part 1 of 4)
CREDIT TOTALS
NEW COURTHOUSE
Certified
Silver
Gold
Certified
Silver
Gold
Rating:
Case #:
1A
2A
3A
4A
5A
6A
1B
2B
3B
4B
5B
6B
ID#
LEED Prerequisite or Credit
Low
High
Low
High
Low
High
Min Fac
Full Fac
Min Fac
Full Fac
Min Fac
Full Fac
SS
SUSTAINABLE SITES
SS-P1
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
Erosion and Sedimentation Control
Site Selection
SS-1
1
1
1
1
1
1
Development Density
SS-2
1
1
1
1
1
1
Brownfield Redevelopment
SS-3
1
1
1
Alternative Transportation-
SS-4.1
1
1
1
1
1
1
1
1
1
1
1
1
Public Transportation Access
Alternative Transportation-
SS-4.2
1
1
1
1
Bicycle Storage & Changing Rooms
Alternative Transportation-
SS-4.3
1
1
1
Alternative Fuel Vehicles
Alternative Transportation-
SS-4.4
1
1
1
1
1
1
Parking Capacity
1
1
1
Reduced Site Disturbance-
SS-5.1
1
1
1
Protect or Restore Open Space
Reduced Site Disturbance-
SS-5.2
1
1
1
Development Footprint
1
1
1
2
Stormwater Management-
SS-6.1
1
1
1
1
Rate and Quantity
Stormwater Management-
SS-6.2
1
Treatment
Heat Island Effect -
SS-7.1
1
1
1
1
1
1
1
1
1
Non-roof
2
Heat Island Effect -
SS-7.2
1
1
1
1
1
1
Roof
SS-8
1
1
1
SS Totals (14 Possible Points)
10
3
10
3
10
6
4
4
5
4
5
5
WE
WATER EFFICIENCY
1
1
1
Water-Efficient Landscaping -
WE-1.1
1
1
1
1
1
1
Reduce by 50%
1
1
1
Water-Efficient Landscaping -
WE-1.2
1
1
1
No Potable Use or No Irrigation
Innovative Wastewater Technologies
WE-2
Water Use Reduction-
WE-3.1
1
1
1
1
1
1
1
1
1
1
1
1
20% Reduction
Water Use Reduction -
WE-3.2
1
1
1
1
1
1
1
1
30% Reduction
WE Totals (5 Possible Points)
3
3
3
3
4
3
1
1
2
2
2
2
KEY
1
Synergistic Credit Tag - Courthouse
Measures that are met based on GSA standards or mandates (no premium)
(Credits with the same tag number have synergistic properties)
Measures with no cost premiums, or with potential cost decreases
Measures with low cost premiums (<50K)
1
Synergistic Credit Tag - Office Building
Measures with moderate cost premiums (50K - 150K)
(Credits with the same tag number have synergistic properties)
Measures with high cost premiums (>150K), or that present design challenges
Measures not applicable to the project
Measures not pursued, although technically viable
GSA LEED COST STUDY