Section 1: Twelve LEED Rating Scenarios
TABLE 1-1: 12 LEED SCENARIOS (Part 3 of 4)
CREDIT TOTALS
NEW COURTHOUSE
Certified
Silver
Gold
Certified
Silver
Gold
Rating:
Case #:
1A
2A
3A
4A
5A
6A
1B
2B
3B
4B
5B
6B
ID#
LEED Prerequisite or Credit
Low
High
Low
High
Low
High
Min Fac
Full Fac
Min Fac
Full Fac
Min Fac
Full Fac
INDOOR ENVIRONMENTAL QUALITY
EQ
EQ-P1
Minimum IAQ Performance
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
Environmental Tobacco Smoke (ETS) Control
EQ-P2
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
1A
1B
1C
1D
1C
3
3
3
EQ-1
1
1
1
1
1
1
1
1
1
1
Ventilation Effectiveness
EQ-2
1
1
1
1
1
1
1
1
1
1
1
1
Construction IAQ Management Plan-
EQ-3.1
1
1
1
1
1
1
1
1
1
1
1
During Construction
Construction IAQ Management Plan-
EQ-3.2
1
1
1
1
1
1
1
1
1
1
1
Before Occupancy
Low-Emitting Materials-
EQ-4.1
1
1
1
1
1
1
1
1
1
1
1
1
Adhesives and Sealants
Low-Emitting Materials-
EQ-4.2
1
1
1
1
1
1
1
1
1
1
1
1
Paints and Coatings
Low-Emitting Materials-
EQ-4.3
1
1
1
1
1
1
1
1
1
1
1
1
Carpet
4
5
3
3
4
4
4
4
Low-Emitting Materials-
EQ-4.4
1
1
1
1
1
1
1
1
Composite Wood
Indoor Chemical and Pollutant Source Control
EQ-5
1
1
1
1
1
1
1
1
1
1
1
1
Controllability of Systems-
EQ-6.1
1
1
Perimeter Spaces
Controllability of Systems-
EQ-6.2
1
1
1
1
1
1
Non-Perimeter Spaces
Thermal Comfort-
EQ-7.1
1
1
1
1
1
1
1
Compliance with ASHRAE 55-1992
Thermal Comfort-
EQ-7.2
1
1
1
1
1
1
1
Permanent Monitoring System
EQ-8.1
Daylight 75% of Spaces
EQ-8.2
1
Views for 90% of Spaces
EQ Totals (15 Possible Points)
8
11
10
12
11
12
9
9
9
9
11
12
KEY
1
Synergistic Credit Tag - Courthouse
Measures that are met based on GSA standards or mandates (no premium)
(Credits with the same tag number have synergistic properties)
Measures with no cost premiums, or with potential cost decreases
Measures with low cost premiums (<50K)
1
Synergistic Credit Tag - Office Building
Measures with moderate cost premiums (50K - 150K)
(Credits with the same tag number have synergistic properties)
Measures with high cost premiums (>150K), or that present design challenges
Measures not applicable to the project
Measures not pursued, although technically viable
GSA LEED COST STUDY