Section 2: Individual LEED Credit Reviews
in the detailed credit breakdowns of Appendices C
and D.
The summary ECCs are reported in the following
format:
Courthouse (New Construction, 262,000 GSF)
Total Credit Cost ................................................ $X
Cost Impact ($/GSF)...............................$X/GSF
Cost Impact (%).................................................X%
Total Credit Cost ................................................ $X
Cost Impact ($/GSF)...............................$X/GSF
Cost Impact (%), Min. Facade.........................X%
Cost Impact (%), Full Facade ..........................X%
Additional Considerations
This section addresses additional key issues related
to the design strategies, building systems, or
material types that have been identified to earn the
LEED prerequisite or credit.
Synergistic Credits
This section identifies other LEED prerequisites
or credits that may be synergistically related to the
credit being reviewed. The section specifically
identifies the synergistic credit scenarios that have
been developed into synergistic cost estimates, per
Section Three of the study.
Supporting Calculations
Where applicable, this section includes calculations
to support the assumptions used in the "Basis for
Cost Assumption" section above.
GSA LEED COST STUDY
26