Introduction
points under credit EA-1 (Optimize Energy
Performance). The energy model was also used to
determine the amount of renewable energy
required for credit EA-2 (Renewable Energy).
Appendix J:
DOE-2 Energy Modeling Summary Office
Building
This appendix describes the input and results of
the computer energy model developed for the
Office Building. The scope and level of detail are
the same as in Appendix I.
Appendix K:
Reference Cost Estimate Courthouse
This appendix consists of the complete reference
estimate for the new Courthouse. The estimate
defines the baseline construction costs for the
project, including all key features mandated
through PBS-P100 and the U.S. Courts Design
Guide. The reference estimate is the point of
comparison for all of the LEED measures defined
for the Courthouse.
Appendix L:
Reference Cost Estimate Office Building,
Minimal Faade Renovation
This appendix consists of the complete reference
with the minimal faade renovation. The estimate
defines the baseline construction costs for the
project, including all key features mandated
through P100. The reference estimate is the point
of comparison for all of the LEED measures
defined for the minimal faade renovation variant
of the Office Building.
Appendix M:
Reference Cost Estimate Office Building,
Full Faade Renovation
This appendix consists of the complete reference
with the full faade renovation. The estimate
defines the baseline construction costs for the
project, including all key features mandated
through P100. The reference estimate is the point
of comparison for all of the LEED measures
defined for the full faade renovation variant of
the Office Building.
GSA LEED COST STUDY