DESIGN
CONSTRUCTION
PLANNING
POST-CONSTRUCTION
Recommissioning
J. O&M Review
Construction
CxA
Management Manual
The
Commissioning
Record
K. Training Documentation
Construction
CxA/Construction Contractor
includes
a
Recommissioning
Management
Manual
which
L. Warranty Review
Construction
CxA
provides guidance and establishes
timelines for recommissioning
M. Test Data Reports
Construction
CxA/Construction Contractor
building systems and components.
The Recommissioning Management
Summary Report
Construction
CxA
Manual is a requirement for LEED's
Recommissioning Management Manual
Construction
CxA/GSA PM
Energy & Atmosphere Credit 3.
The Commissioning Record shall include a brief summary report that includes a list
of participants and roles, brief building description, overview of commissioning and
testing scope, and a general description of testing and verification methods. For
each piece of commissioned equipment, the report shall contain the disposition
of the Commissioning Agent regarding the adequacy of the equipment, documen-
tation and training meeting the contract documents in the following areas:
1) Equipment meeting the equipment specifications,
2) Equipment installation,
3) Functional performance and efficiency,
4) Equipment documentation, and
5) Operator training.
Recommissioning Management Manual
The Recommissioning Management Manual provides guidance and estab-
lishes timelines for recommissioning of building systems and components. The
format of the Recommissioning Management Manual will closely parallel the
Commissioning Plan for the facility.
building commissioning
45
process