Section 2: Individual LEED Credit Reviews
Table MR5-2: 20 Percent Regional Materials, "High Cost" Courthouse Scenario
Total Construction Cost
$ 46,399,975 For Case 6A (Gold), worst case scenario
Total Materials Cost
$ 17,998,582 Calculated Materials Cost for Case 6A (excl. MEP, labor & equip.)
Regionally-
Regionally-
Installed
Product
Product
Product
Extracted
Manufactured
Cost
Cost
Cost %
Products
Products
CONCRETE
Concrete fill, 14" dia pipe pile foundations
$
597,163
33%
$
197,064
$
197,064
--
CIP concrete reinforced basement wall, elevator
$
469,433
20%
$
93,887
$
93,887
--
pit, escalator pit
CIP concrete foundation grade beams at pile
$
234,865
13%
$
30,532
$
30,532
--
foundations
CIP concrete slab on grade 4"/3000 psi and
$
245,823
30%
$
73,747
$
73,747
--
6"/4000 psi
CIP structural slab building system, complete with
$
475,351
10%
$
47,535
$
47,535
--
columns, beams, etc.
Concrete fill, steel roof/floor deck
$
1,265,868
21%
$
265,832
$
265,832
--
CONCRETE MASONRY UNITS
CMU walls, 6" or 8" thick, grouted solid
$
513,208
33%
$
169,359
$
169,359
--
CMU at raised floor
$
413,527
20%
$
82,705
$
82,705
--
$
1,490,039
3%
$
44,701
$
44,701
--
CMU backup for parapet wall, 24" high
$
182,634
5%
$
9,132
$
9,132
--
PRECAST CONCRETE WALL SYSTEM
Precast Concrete Wall System (concrete and
$
1,796,400
43%
$
772,452
$
772,452
--
steel reinforcing components)
CASEWORK
Fixed furniture, casework and paneling (wood
$
3,735,153
67%
$
2,502,553
$
2,502,553
--
PROJECT TOTALS:
$
4,289,499
Regionally-Manufactured Products ($):
23.8%
Regionally-Manufactured Products (%):
$
-
Regionally-Extracted Products ($):
0.0%
Regionally-Extracted Products (% of Total Matrls. Cost):
GSA LEED COST STUDY
120