Table MR5-3: 20 Percent Regional Materials, "Minimal Faade Renovation" Office Building Scenario
Total Construction Cost
$ 29,746,173 For Case 5B (Gold), worst case scenario
Total Materials Cost
$ 5,383,574 Calculated Materials Cost for Case 5B (excl. MEP, labor & equip.)
Regionally-
Regionally-
Product
Installed
Product
Extracted
Manufactured
Product
Cost %
Cost
Cost
Products
Products
STEEL
Architectural Metals at exterior
$
148,539
55%
$
81,696
$
81,696
--
Steel studs @ interior partitions, FR and non FR
$
722,504
12%
$
86,700
$
86,700
--
Steel studs @ furred out partitions
$
274,743
33%
$
90,665
$
90,665
--
Stainless steel 18 gauge steel canopy and cable
$
17,250
65%
$
11,213
$
11,213
--
GYPSUM WALLBOARD
GWB @ interior partitions, FR and non FR
$
688,099
19%
$
130,739
$
130,739
$
130,739
Patch and repair existing GWB
$
361,060
10%
$
36,106
$
36,106
$
36,106
GWB over existing partitions
$
36,092
40%
$
14,437
$
14,437
$
14,437
GWB @ furred out partitions
$
261,660
13%
$
34,016
$
34,016
$
34,016
INSULATION & FIREPROOFING
Batt insulation @ interior partitions
$
688,099
10%
$
68,810
$
68,810
--
Batt insulation @ furred out partitions
$
261,660
23%
$
60,182
$
60,182
--
ACOUSTICAL CEILING PANELS
ACT panels
$
788,586
35%
$
276,005
$
276,005
$
276,005
PORCELAIN TILE
Porcelain tile @ walls
$
78,249
50%
$
39,125
$
39,125
$
39,125
Porcelain tile @ floors
$
76,715
50%
$
38,358
$
38,358
$
38,358
Porcelain tile base
$
14,484
50%
$
7,242
$
7,242
$
7,242
INTERIOR GLAZING
1/4" float glass @ fixed transoms
$
242,500
35%
$
84,875
$
84,875
--
(for credit EQ-8.2)
CASEWORK
Casework (wood veneer and PLAM finishes)
$
47,764
67%
$
32,002
$
32,002
--
PROJECT TOTALS:
$
1,092,169
Regionally-Manufactured Products ($):
20.3%
Regionally-Manufactured Products (%):
$
576,026
Regionally-Extracted Products ($):
10.7%
Regionally-Extracted Products (% of Total Matls. Cost):