Section 2: Individual LEED Credit Reviews
Table MR5-1: 20 Percent Regional Materials, "Low Cost" Courthouse Scenario
Total Construction Cost
$ 43,542,871 For Case 5A (Gold), worst case scenario
Total Materials Cost
$ 16,795,900 Calculated Materials Cost for Case 5A (excl. MEP, labor & equip.)
Regionally-
Regionally-
Installed
Product
Product
Product
Extracted
Manufactured
Cost
Cost
Cost %
Products
Products
CONCRETE
Concrete fill, 14" dia pipe pile foundations
$
597,163
33%
$
197,064
$
197,064
$
197,064
CIP concrete reinforced basement wall, elevator
$
469,433
20%
$
93,887
$
93,887
$
93,887
pit, escalator pit
CIP concrete foundation grade beams at pile
$
234,865
13%
$
30,532
$
30,532
$
30,532
foundations
CIP concrete slab on grade 4"/3000 psi and
$
245,823
30%
$
73,747
$
73,747
$
73,747
6"/4000 psi
CIP structural slab building system, complete with
$
475,351
10%
$
47,535
$
47,535
$
47,535
columns, beams, etc.
Concrete fill, steel roof/floor deck
$
1,265,868
21%
$
265,832
$
265,832
$
265,832
CONCRETE MASONRY UNITS
CMU walls, 6" or 8" thick, grouted solid
$
513,208
33%
$
169,359
$
169,359
$
169,359
CMU at raised floor
$
413,527
20%
$
82,705
$
82,705
$
82,705
$
1,490,039
3%
$
44,701
$
44,701
$
44,701
CMU backup for parapet wall, 24" high
$
182,634
5%
$
9,132
$
9,132
$
9,132
PRECAST CONCRETE WALL SYSTEM
Precast Concrete Wall System (concrete and
$
1,709,574
43%
$
735,117
$
735,117
$
735,117
steel reinforcing components)
GYPSUM WALLBOARD
GWB @ precast concrete wall system
$
1,526,940
1%
$
15,269
$
15,269
$
15,269
GWB @ interior partitions, two sides, FR and non-
$
981,551
24%
$
235,572
$
235,572
$
235,572
FR, uninsulated
Double layer GWB, staggered studs, sound
$
826,328
26%
$
214,845
$
214,845
$
214,845
insulation
Suspended GWB
$
233,888
45%
$
105,250
$
105,250
$
105,250
GWB @ interior partitions, two sides, FR and non
$
458,511
23%
$
105,458
$
105,458
$
105,458
FR, sound insulation
GWB @ Shaftwalls and chases
$
146,427
29%
$
42,464
$
42,464
$
42,464
GWB @ interior partition, one side, sound
$
111,506
17%
$
18,956
$
18,956
$
18,956
insulation
Misc. GWB assemblies
$
111,468
15%
$
16,720
$
16,720
$
16,720
GWB taped and finished one side on furring studs $
68,153
18%
$
12,268
$
12,268
$
12,268
CASEWORK
Fixed furniture, casework and paneling (wood
$
3,049,365
67%
$
2,043,075
$
2,043,075
--
PROJECT TOTALS:
$
4,559,487
Regionally-Manufactured Products ($):
27.1%
Regionally-Manufactured Products (%):
$
2,516,412
Regionally-Extracted Products ($):
15.0%
Regionally-Extracted Products (% of Total Matls. Cost):
GSA LEED COST STUDY
119