Table MR5-4: 20 Percent Regional Materials, "Full Faade Renovation" Office Building Scenario
Total Construction Cost
$ 30,423,255 For Case 6B (Gold), worst case scenario
Total Materials Cost
$ 5,695,150 Calculated Materials Cost for Case 6B (excl. MEP, labor & equip.)
Regionally-
Regionally-
Installed
Product
Product
Product
Extracted
Manufactured
Cost
Cost
Cost %
Products
Products
STEEL
Architectural Metals at exterior
$
148,539
55%
$
81,696
$
81,696
--
Stainless steel 18 gauge steel canopy and cable
$
17,250
65%
$
11,213
$
11,213
--
PRECAST CONCRETE WALL SYSTEM
Precast Concrete Wall System (concrete and
$
2,034,630
43%
$
874,891
$
874,891
$
834,198
steel reinforcing components)
GYPSUM WALLBOARD
GWB @ precast concrete wall system
$
2,034,630
1%
$
20,346
$
20,346
$
20,346
GWB @ interior partitions, FR and non FR
$
688,099
19%
$
130,739
$
130,739
$
130,739
Patch and repair existing GWB
$
361,060
10%
$
36,106
$
36,106
$
36,106
GWB over existing partitions
$
36,092
40%
$
14,437
$
14,437
$
14,437
GWB @ furred out partitions
$
45,354
13%
$
5,896
$
5,896
$
5,896
INSULATION & FIREPROOFING
Batt insulation @ interior partitions
$
688,099
10%
$
68,810
$
68,810
--
Batt insulation @ furred out partitions
$
261,660
23%
$
60,182
$
60,182
--
CASEWORK
Casework (wood veneer and PLAM finishes)
$
47,764
67%
$
32,002
$
32,002
--
PROJECT TOTALS:
$
1,336,317
Regionally-Manufactured Products ($):
23.5%
Regionally-Manufactured Products (%):
$
1,041,722
Regionally-Extracted Products ($):
18.3%
Regionally-Extracted Products (% of Total Matls. Cost):