sample scope for commissioning ser vices (continued)
5.
List the individual(s) who will serve as the lead Commissioning Agent for the
Design Stage and for the construction phase of the contract (they may be
different people).
6.
Provide resumes for key staff and subconsultants. The resumes shall include
specific information about expertise in commissioning tasks, (e.g. design reviews,
specification writing, commissioning management, troubleshooting, test writing,
test execution, energy management, sustainable design, etc.).
7.
Briefly describe relevant experience of the proposer's team in the following areas.
List involvement of key team members.
a) projects similar to this one;
b) O&M experience;
c) energy-efficient equipment design and control strategy optimization;
d) project and construction management; and
e) system design (specify disciplines)
f) system troubleshooting
g) experience in environmental sustainable design
h) knowledge and experience in fire protection and life safety systems
8.
Describe your proposed approach to managing the project expertly and efficiently,
including distribution of tasks, travel, duration of which staff will be on site during
what periods of time, etc. Describe what approach you will take to integrate
the commissioning into the normal design and construction process in order to
minimize potential time delays. Describe what you will do to foster teamwork and
cooperation from contractors and design team and what you will do to minimize
adversarial relationships. Describe how you intend to determine the appropriate
level of commissioning effort for the various systems and equipment.
9.
As an attachment, provide the following work products that members of the
proposer's team developed. List the team member who actually wrote the
document and the projects on which they were used. Work from the designated
Commissioning Provider is preferred.
a) commissioning plan that was executed (the process part of the plan);
b) commissioning specifications; and
c) an actual functional test procedure form that was executed (the filled out vesion).
10. Provide a fixed, lump sum total cost to accomplish the work for the Design Stage.
All task amounts include associated meetings, progress reports and direct costs
68
appendices