DESIGN
CONSTRUCTION
PLANNING
POST-CONSTRUCTION
Development Study (PDS). Depending on the CxA delivery method (i.e. CM versus
Scope for Commissioning Agent
Services
GSA contracts the CxA), this may be the responsibility of either GSA or the CM.
Appendix A of the Building
If the RFQ is performed by the CM, this format may vary slightly. For reference, a
Commissioning Guide provides a
sample Scope for Commissioning Services is included in Appendix A.
Sample Scope for Commissioning
Agent Services, which is a useful
starting point for tailoring and
Building type, square footage, general program, overall project
customization by project teams.
Project Background
budget, milestone schedule dates, LEED and other certification
pursuits, etc.
Objectives
GSA project objectives for commissioning
Design, Construction & Post-Construction Stage expectations for
Scope of Work
the Commissioning Agent
Preliminary identification of the systems and assemblies to be
Systems and Assemblies
Commissioned. Once contracted, the CxA will further develop this
matrix.
Qualifications
Desired qualification of the CxA
Proposal
Expectations for format & content of prospective CxA's proposal
Statement on GSA review of CxA changes in personnel for the
Change in Personnel
project
A table indicating the selection criteria and scoring system for
Selection Criteria
Proprietary Information
(disclaimer)
Protection and Control of
Government Documents
(disclaimer)
Commissioning Agent Selection
This service shall be acquired in the same manner as other professional services.
The Commissioning Agent shall be chosen on the primary basis of qualifications
and not solely based on price. The involved work order and selection procedures
should adhere to the involved IDIQ provisions for work order issuance, and be
fitted with requirements/contents that are aligned with standard work order
formats. National IDIQ contracts are in place that can support commissioning
services.
building commissioning
26
process