Sample Form:
CSI Masterformat Detail Report
PROJECT NAME
DATE
PROJECT PHASE
ESTIMATOR
Equipment/Other
Quantity
Material
Labor
Unit
Description
Cost
Quantity
UOM
Unit
Subtotal
Unit
Subtotal
Unit
Subtotal
Total
02 Site Work
1 Excavate trench; mdm soil,
expose pipe, 1/2 CY excavator
16.8
EA
$
0.96
16.13
0.37
0.37
light soil
16.8
EA
$
17.57
295.14
0.37
1
0.37
3 Fill, spread borrow w/dozer
16.8
EA
$
0.41
6.96
0.37
0.37
in 6" layers, ari tamp
16.8
EA
$
6.53
109.69
0.37
6
0.37
Site Work Subtotal
$
3
300 F A C I L I T I E S S T A N D A R D S
FOR THE
PUBLIC
BUILDINGS
SERVICE
A.1 General Requirements Cost Estimating Requirements
Revised March 2005 PBS-P100