Sample Form: Project Cost Summary
PROJECT TITLE:
PROJECT LOCATION:
AREA (GSF) =
CSI MASTERFORMAT
DIRECT
ECC COST
ECC COST/GSF
01
General Requirements
$
$
02
Sitework/Demo
$
$
03
Concrete
$
$
04
Masonry
$
$
05
Metals
$
$
06
Woods and Plastics
$
$
07
Thermal and Moisture Protection
$
$
08
Doors and Windows
$
$
09
$
$
10
Specialties
$
$
11-13 Equipment, Furnishings and Special Construction
$
$
14
Conveyance
$
$
15
Mechanical
$
$
16
Electrical
$
$
Direct Cost Summary
$
$
Design Contingency
$
$
Subtotal
$
$
Overhead and Profit
$
$
Subtotal
$
$
0.0%
$
$
Subtotal
$
$
Escalation from Estimate Date Mid-Point
0.0%
$
$
Subtotal
$
$
Construction Contingency
0.0%
$
$
Reservation Art in Architecture
0.0%
$
$
Subtotal
$
$
ECC (ESTIMATED CONSTRUCTION COST)
$
$
299
SUBMISSION
REQUIREMENTS
A.1
General Requirements Cost Estimating Requirements
Revised March 2005 PBS-P100