Standpipe and Fire Department Hose Connection Systems
of operation. Prepare test reports. Verify that training for
building operating staff includes information on what to
Non-Water Based Fire Extinguishing Systems
do for each mode of operation. Verify that an appropriate
Wet Chemical Systems
number of spare system parts are provided per terms of
the construction contract. Assure that the GSA regional
Smoke Management Systems
fire protection engineer is involved in the scheduling of
all acceptance testing and has an opportunity to attend
Atrium Smoke Removal
testing as required. Participate in the review of test results
and needed corrections with the GSA regional fire
Emergency Power Systems
protection engineer as a means to facilitate issuing a
Fire Doors and Windows
Certificate of Occupancy.
Emergency Lighting and Exit Lighting
Post Construction Inspection/Operations: Coordinate with
GSA project management staff to assure that appropriate
Exit signage
service/maintenance agreements exist for the care/
Photoluminescent Material Stairway Marking.
servicing of the commissioned systems.
Egress Systems
These activities shall be done for the following systems:
Aisles
Fire Alarm Systems
Exit Access
Initiating Devices and Related Circuits
Exit Stairs
Notification Appliances and Related Circuits
Exit Doors & Hardware
Power Supplies and Protection of Same
Exits
Communication of Signals Exterior to the Building
Exit Discharge
(Central Station & MegaCenter)
System Controls and Peripherals
Other Equipment and Systems
Interface with Other Systems (e.g., HVAC, Security
Spray Applied Fire Resistive Materials
Systems, etc.)
Firestopping Materials
Water Based Fire Extinguishing Systems
Interior Finish Materials
Sprinkler Systems
High Density Storage Systems
Water Supply Information
Essential Electronic Facility Protection
Fire Pumps
Portable Fire Extinguishers and Cabinets
Fire Pump
Fire Command Center
Jockey Pump
Equivalent Technologies
Fire Pump Controller and Transfer Switch
Pressure Regulation at Fire Pump
Fire Pump Room
215
FIRE
PROTECTION
&
LIFE
SAFETY
7.4
Revised March 2005 PBS-P100