MID RISE FEDERAL COURTHOUSE REFERENCE ESTIMATE
Prepared: 1 August 2003
Date: October 2003
Tenant Improvements
Area: 15,000 USF
Basement Parking
DESCRIPTION
QUANTITY
UNIT
RATE
SUBTOTAL
TOTAL
Exposed structure above
14,173 SF
,480
56 SF
.01
3
Painted plaster, premium over ACT ceiling
27,708
D
SERVICES
D10
Conveying Systems
1 EA
,500.00
,500
Additional stop for service elevator
1 EA
,900.00
,900
Additional stop for passenger elevator
11,400
Total D10 Conveying Systems
D20
Plumbing
15,000 SF
.61
,150
D2010 Plumbing Storm Drain System
15,000 SF
,450
Water Pipe to hose bibbs
57,600
Total D20 Plumbing
D30
HVAC
HVAC Basis: Ventilation, controls,
15,000 SF
.25
,750
unconditioned fans, Allow
33,750
Total D30 HVAC
D40
Fire Protection
15,000 SF
||content||
.80
,000
D4010 Fire Protection Sprinkler Systems
27,000
Total D40 Fire Protection
Note: See Construction Criteria For Tenant
fitout detail descriptions.