Section 2: Individual LEED Credit Reviews
LEED Credit EA-5:
Practical Applications
Measurement
GSA's P100 lists a minimum number of control
and monitoring points that are required for
and Verification
installed HVAC equipment. In addition, P100
required for all projects over 100,000 square feet.
Intent:
Because of these baseline requirements, the
additional measures needed to comply with this
Provide for the ongoing accountability and
credit will typically involve:
optimization of building energy and water
consumption performance over time.
Additional meters and/or panels to fully
monitor the building systems listed in the
Requirement:
credit requirement
Install continuous metering equipment for the
Additional BAS tie-ins for the new meters and
following end-uses:
panels
Lighting systems and controls
Additional trend log programming for the
Constant and variable motor loads
BAS system
In addition, the design teams will need to develop a
Chiller efficiency at variable loads (kW/ton)
Measurement and Verification (M&V) Plan, based
Cooling load
on the referenced IPMVP Standard, that includes:
Air and water economizer and heat
A listing of systems and equipment to be
recovery cycles
Air distribution static pressures and
monitored
A definition of building baseline energy
ventilation air volumes
Boiler efficiencies
performance
A methodology to verify projected savings
Building-related process energy systems and
Suggested procedures for system/equipment
equipment
Indoor water risers and outdoor irrigation
corrections.
systems
The M&V Plan is considered a project soft cost,
Develop a Measurement and Verification plan
and is addressed in Section Four of this report.
that incorporates the monitoring information
from the above end-uses and is consistent with
Basis for Cost Assumption
Option B,C or D of the 2001 International
Performance Measurement & Verification Protocol
For both the Courthouse and Office Building
(IPMVP) Volume I: Concepts and Options for
models, additional metering equipment is
Determining Energy and Water Savings.
identified, above and beyond GSA requirements,
to meet the credit criteria. The equipment includes:
(1 point)
Lighting panel meters at all tenant lighting
panels
Cost Impact = 4
Gas flow meters at supply lines feeding the
Receptacle panel meters at all tenant
1
2
3
4
5
receptacle panels
GSA
No
Low
Moderate
High
Domestic water flow meters
Standard
premium,
premium
premium
premium
(no cost)
psble svgs
(<50K)
(50-150K)
(>150K)
In addition, cost premiums are included for tie-ins
from the new meters to the BAS system. BAS tie-
in costs are also defined for the building chiller
GSA LEED COST STUDY
86