Section 2: Individual LEED Credit Reviews
Summary of First Cost Impacts
Courthouse (New Construction, 262,000 GSF)
The credit is not applicable.
The credit is not applicable.
Additional Considerations
There is an inherent relationship between this
credit and Credit EA-1 (Optimize Energy
Performance). By lowering the overall energy use
of the building (the goal of EA-1), the required
amount of green power to purchase to achieve this
credit is also reduced.
Synergistic Credits
None identified (with construction cost impacts).
GSA LEED COST STUDY
89