Section 2: Individual LEED Credit Reviews
amp meters, and for the flow meters for the
cooling tower make-up water (these meters are
assumed to be in the Reference Building costs). A
trend log programming cost is also defined based
on the more extensive metering.
Summary of First Cost Impacts
Courthouse (New Construction, 262,000 GSF)
Total Credit Cost ......................................7,058
Cost Impact ($/GSF)...........................
||content||
.41/GSF
Cost Impact (%)............................................ 0.19%
Total Credit Cost ......................................1,980
Cost Impact ($/GSF)...........................
||content||
.40/GSF
Cost Impact (%), Min. Facade.................... 0.31%
Cost Impact (%), Full Facade ..................... 0.30%
Additional Considerations
None identified.
Synergistic Credits
None identified (with construction cost impacts).
GSA LEED COST STUDY
87