100% OPEN OFFICE BACK-UP
MINIMAL FAADE RENOVATION
Prepared: 1 August 2003
Reference Date: 10/1/2003
Tenant Improvements
Area: 98,150 USF
!00% Open Office
DESCRIPTION
QUANTITY
UNIT
RATE
SUBTOTAL
TOTAL
ACT ceiling in Shell & Core
GWB soffit over counters, premium over ACT
716 SF
||content||
.72
||content||
,232
381,989
D
SERVICES
Plumbing
D20
10 EA
||content||
,352.52
,525
D2010 Plumbing Premium: Stainless steel sink
10 EA
0.84
,508
Wet Stack Allowance
5 EA
1.24
,156
Connect hot water to central system
20,190
Total D20 Plumbing
D30
HVAC
Additional exhaust & outside air, controls
98,150 SF
,576
75,576
Total D30 HVAC
D40
Fire Protection
98,150 SF
,797
D4010 Premium: Relocate 10% of sprinkler heads
10,797
Total D40 Fire Protection
Note: See Construction Criteria For Tenant
fitout detail descriptions.
D50
Electrical
98,150 SF
,704
D5010 Panel and Feeder
flush floor outlets, special floor outlets for
98,150 SF
.78
1,007
equipment.
D5040 Fire alarm A/V devices, telecom raceway to
98,150 SF
.62
7,153
flush floor outlets, PA system, raceway
incl
D5050 Communication and Security Systems
643,864
Total D50 Electrical
Page 2