BASEMENT PARKING BACK-UP
MINIMAL FAADE RENOVATION
Prepared: 1 August 2003
Reference Date: 10/1/2003
Tenant Improvements
Area: 40,700 USF
Basement Parking
DESCRIPTION
QUANTITY
UNIT
RATE
SUBTOTAL
TOTAL
Base:
61 LF
||content||
.78
9
Vinyl cove base
C3020 Floor Finishes
C3030 Ceiling Finishes
Paint exposed structure above
40,700 SF
,967
63,340
D
SERVICES
Conveying Systems
D10
Elevator renovation excluded
-
Total D10 Conveying Systems
D20
Plumbing
40,700 SF
.61
6,927
D2010 Plumbing Storm Drain System
146,927
Total D20 Plumbing
D30
HVAC
HVAC Basis: Ventilation, controls,
40,700 SF
.25
,575
unconditioned fans, Allow
91,575
Total D30 HVAC
D40
Fire Protection
40,700 SF
||content||
.80
,260
D4010 Fire Protection Sprinkler Systems
73,260
Total D40 Fire Protection
Note: See Construction Criteria For Tenant
fitout detail descriptions.
Page 2