Section 2: Individual LEED Credit Reviews
LEED Credit SS-4.1:
Basis for Cost Assumption
Alternative Transportation
Because the site selection process is outside the
scope of this study, no construction cost premium
Public Transportation
is attributed to sites that meet the credit
Access
requirements. Any on-site accommodations for
mass transit (e.g., covered waiting areas for buses)
are costs that GSA would have assumed prior to its
LEED directive; therefore, there is no additional
Intent
LEED-related cost. This credit is assumed to be
Reduce pollution and land development impacts
earned in all of the Courthouse and Office Building
from automobile use.
scenarios of this study.
Requirement
Summary of First Cost Impacts
Locate project within 1/2 mile of a commuter
rail, light rail or subway station or 1/4 mile of
Courthouse (New Construction, 262,000 GSF)
two or more public or campus bus lines usable
by building occupants.
No identified cost premiums.
(1 point)
Cost Impact = 2
No identified cost premiums.
1
2
3
4
5
Additional Considerations
GSA
No
Low
Moderate
High
None identified.
Mandate
premium,
premium
premium
premium
(no cost)
psble svgs
(<50K)
(50-150K)
(>150K)
Synergistic Credits
Practical Applications
None identified (with construction cost impacts).
Project site selection is outside the scope of this
study; however, access to public transportation is
given specific emphasis in GSA projects. The Site
Circulation Design section of GSA's P100 notes
that "GSA encourages the use of public
transportation among employees and visitors. The
potential need for a bus stop should be considered
early in the design of a GSA building in an urban
setting and should be discussed with planners of
the mass transit system."
GSA LEED COST STUDY