W H AT T O D O W H E N Y O U A R E D O N E
When you have modified the document and the project manager and region are satisfied
with it, it should be forwarded to the Office of the Chief Architect project coordinator for
review. Once OCA has re v i e wed it and any necessary changes have been made, it may be
submitted to FedBizOpps by the contracting officer.
O R G A N I Z I N G T H E E VA L UAT I O N B O A R D F O R Y O U R A / E S E L E C T I O N
Please remember to contact the director of the Center for Design Excellence and the Arts
in the Office of the Chief Architect (202.501.1888) at least a month before you would
like to schedule your Stage I review to request an OCA peer and a national peer for your
A/E Evaluation Board. In accord with national Design Excellence procedures and the
related procurement regulations, the A/E Evaluation Board shall consist of five
p rofessionals: a Design Excellence peer from the private sector, a GSA regional architect,
a GSA regional engineer, a representative with a design and procurement background
from the client agency or designated tenant, and a design professional from the Office
of the Chief A rchitect. Project managers may not sit on the A/E Evaluation Board for their
own projects. The Chief Architect shall concur on all appointments to the A/E Evaluation
Board.
28
chapter 5 resources