DESIGN
CONSTRUCTION
PLANNING
POST-CONSTRUCTION
sioning and the project team may opt to pursue an added LEED point for additional
commissioning. The process provided in this Guide provides the necessary steps
to comply with both prerequisite and additional commissioning requirements.
Commissioning for LEED
The LEED 2.1 commissioning criteria is explained in more detail below.
Certification
The process provided in GSA's
LEED Commissioning Criteria Energy & Atmosphere Prerequisite 1
Building Commissioning Guide
provides the necessary steps to
Fundamental Building Systems
Energy & Atmosphere Credit 3 (1 Pt.)
comply with the United States
Green Building Council's (USGBC)
Commissioning
Additional Commissioning
prerequisite
and
additional
commissioning
requirements
INTENT
INTENT
for Leadership in Energy &
Verify and ensure that fundamental building
Verify and ensure that entire building is de-
Environmental Design (LEED)
signed, constructed and calibrated to oper-
elements and systems are designed, installed
Certification.
ate as intended.
and calibrated to operate as intended.
REQUIREMENTS & SUBMITTALS
REQUIREMENTS & SUBMITTALS
(7-9 must be done by independent 3rd Party)
1. Engage a commissioning authority
1. Engage a commissioning authority
2. Review design intent & Basis of Design
2. Review design intent & BOD documenta-
(BOD) documentation
tion
3. Include Cx requirements in construction
3. Include Cx requirements in construction
documents
documents
4. Develop & utilize a Commissioning Plan
4. Develop & utilize a Commissioning Plan
5. Verify installation, functional perfor-
5. Verify installation, functional perfor-
mance, training and documentation
mance, training and documentation
6. Complete a commissioning report
6. Complete a commissioning report
7. Conduct a focused review of the design
prior to CD phase
8. Conduct a focused review of the Con-
struction Documents when close to
completion
9. Conduct a selective review of contractor
submittals of commissioned equipment
10. Develop a recommissioning manage-
ment manual
11. Have a contract in place to review with
operational staff current building op-
eration, including plan for resolution
of outstanding commissioning related
issues within 1 year after completion of
construction.
building commissioning
16
process