Section 3: Synergistic Credits
Individual Credit Costs
Credit EA-1(7), Min. Facade...................1,426
Credit EQ-1 ................................................. ,556
Synergistic Credit SN-1D
Total Credit Cost ......................................1,426
Cost Impact ($/GSF)............................07/GSF
Cost Impact (%)............................................ 2.39%
Applicable Scenarios
Credit SN-1A is used in the Office Building / Full
Faade scenario 2B (Certified).
Credit SN-1B is used in the Office Building /
Minimal Faade scenario 3B (Silver).
Credit SN-1C is used in the Office Building / Full
Faade scenarios 4B (Silver) and 6B (Gold).
Credit SN-1D is used in the Office Building /
Minimal Faade scenario 5B (Gold).
GSA LEED COST STUDY
176