Section 2: Individual LEED Credit Reviews
Summary of First Cost Impacts
Courthouse (New Construction, 262,000 GSF)
Total Credit Cost ........................................ ,381
Cost Impact ($/GSF)...........................
||content||
.10/GSF
Cost Impact (%)............................................ 0.05%
Total Credit Cost ........................................ ,507
Cost Impact ($/GSF)...........................
||content||
.07/GSF
Cost Impact (%), Min. Facade.................... 0.05%
Cost Impact (%), Full Facade ..................... 0.05%
Additional Considerations
If a GSA facility is designated as non-smoking, and
no exterior smoking areas are allowed at building
entries or near operable windows, no cost
premiums are associated with this credit.
Synergistic Credits
None identified (with construction cost impacts).