Section 2: Individual LEED Credit Reviews
LEED EA Prerequisite 3:
Summary of First Cost Impacts
CFC Reduction in
Courthouse (New Construction, 262,000 GSF)
HVAC&R Equipment
No identified cost premiums.
Intent:
Reduce ozone depletion.
No identified cost premiums.
Requirement:
Zero use of CFC-based refrigerants in new base
Additional Considerations
building HVAC&R systems. When reusing
existing base building HVAC equipment,
None identified.
complete a comprehensive CFC phase-out
conversion.
Synergistic Credits
None identified (with construction cost impacts).
Cost Impact = 1
1
2
3
4
5
GSA
No
Low
Moderate
High
Standard
premium,
premium
premium
premium
(no cost)
psble svgs
(<50K)
(50-150K)
(>150K)
Practical Applications
CFC-based refrigerants are no longer available in
the United States for new HVAC&R equipment.
GSA also prohibits the use of CFCs through the
P100 standards. In addition to new buildings,
to comply with this prerequisite, as these projects
typically involve full replacement of existing
HVAC equipment.
Basis for Cost Assumption
The Courthouse and Office Building models both
assume all new HVAC&R equipment; therefore
the prerequisite is earned at no cost.
GSA LEED COST STUDY
72