Table 1-1. LEED Credit Cost Impacts (Part 3 of 3)
IDENTIFIED COST IMPACTS FROM
PROJECTED COST
GSA LEED COST STUDY
IMPACTS
GSA OFFICE OR
NEW
OFFICE BUILDING
INSTITUTIONAL
COMMENTS
COURTHOUSE
MODERN'ZTN.
BUILDINGS
ID#
LEED Prerequisite or Credit
Low
High
Min Fac
Full Fac
New
Mod
INDOOR ENVIRONMENTAL QUALITY (15 Possible Points)
EQ
EQ-P1
Minimum IAQ Performance
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
Environmental Tobacco Smoke (ETS) Control
EQ-P2
PRE.
PRE.
PRE.
PRE.
PRE.
PRE.
No cost premium for buildings with a "no smoking" policy.
Carbon Dioxide Monitoring
EQ-1
1
1
1
1
1
1
Ventilation Effectiveness
EQ-2
1
1
1
1
1
1
Construction IAQ Management Plan-
EQ-3.1
1
1
1
1
1
1
During Construction
Construction IAQ Management Plan-
EQ-3.2
1
1
1
1
1
1
Before Occupancy
Low-Emitting Materials-
EQ-4.1
1
1
1
1
1
1
Adhesives and Sealants
Low-Emitting Materials-
EQ-4.2
1
1
1
1
1
1
Paints and Coatings
Low-Emitting Materials-
EQ-4.3
1
1
1
1
1
1
Carpet
Low-Emitting Materials-
Credit costs can vary depending on the extent of engineered
EQ-4.4
1
1
1
1
1
Composite Wood
wood/agrifiber items (doors, casework) included in the project.
Indoor Chemical and Pollutant Source Control
EQ-5
1
1
1
1
1
1
Controllability of Systems-
Operable windows unlikely for Courthouses (security issues). Costs
EQ-6.1
1
1
1
Perimeter Spaces
can vary for other buildings based on window areas.
Controllability of Systems-
EQ-6.2
1
1
1
Achievable on projects with underfloor air delivery systems.
Non-Perimeter Spaces
Thermal Comfort-
Credit costs are primarily for humidification systems. GSA requires
EQ-7.1
1
1
1
1
1
Compliance with ASHRAE 55-1992
humidification in Courthouses, but not other facilities.
Thermal Comfort-
Costs for monitoring are assumed to be included as part of Credit
EQ-7.2
1
1
1
1
1
Permanent Monitoring System
EQ-7.1 above.
Viability and costs can vary depending on building size, site
EQ-8.1
1
1
Daylight 75% of Spaces
constraints, security requirements and design strategies.
Viability and costs can vary depending on building size, site
EQ-8.2
1
1
1
Views for 90% of Spaces
constraints, security requirements and design strategies.
INNOVATION AND DESIGN PROCESS (5 Possible Points)
ID
Innovation in Design -
ID-1.1
1
1
1
1
1
1
Dedicated Ventilation System
Innovation in Design -
Credit costs can vary depending on the availability and cost of
ID-1.2
1
1
1
Exceed Local Materials Criteria (40%)
regionally manufactured products.
Innovation in Design -
ID-1.3
1
1
1
1
1
Educational Display
Innovation in Design -
ID-1.4A
1
1
1
Exceed Heat Island Effect, Non-Roof criteria
Innovation in Design -
Credit costs can vary depending on the extent of wood items (doors,
ID-1.4B
1
1
1
1
Exceed Certified Wood criteria (75%)
millwork, casework) included in the project.
LEED Accredited Professional
ID-2
1
1
1
1
1
1
KEY
Measures that are met based on GSA standards or mandates (no premium)
Measures with no cost premiums, or with potential cost decreases
Measures with low cost premiums (<50K for Models from GSA LEED Cost Study)
Measures with moderate cost premiums (between 50K - 150K for Models from GSA LEED Cost Study)
Measures with high cost premiums (>150K for Models from GSA LEED Cost Study)
Measures with variable cost premiums, depending on project conditons
Measures not applicable to the project
Measures unlikely to be pursued on typical GSA projects
Measures not pursued, although technically viable
GSA LEED APPLICATIONS GUIDE