BASEMENT PARKING BACK-UP
FULL FAADE RENOVATION
Prepared: 1 August 2003
Reference Date: 10/1/2003
Tenant Improvements
Area: 40,700 USF
Basement Parking
DESCRIPTION
QUANTITY
UNIT
RATE
SUBTOTAL
TOTAL
A
SUBSTRUCTURE
A20
On Grade/Below Grade Construction
A2010 Basement Excavation
A2020 Basement Walls
Wall repairs excluded
A2030 Slab on Grade
Slab repairs excluded
Total A20 On Grade/Below Grade
-
Construction
B
SHELL
Superstructure
B10
B1010 Floor Construction
Slab repairs excluded
B1030 Stair Construction
-
Total B10 Superstructure
B20
Exterior Enclosure
B2020 Exterior Windows and Doors
Concealed automatic overhead coiling loading
dock door complete with frame and hardware
including bottom lock, weather seals (slats to be
3 EA
,312.40
,937
powder finish flat metal)
12,937
Total B20 Exterior Closure
C
INTERIORS
C10
Interior Construction
C1009 Partitions and Doors
Partitions:
Doors:
C1030 Specialties
Paint "no parking" handicapped parking zone on
273 SF
||content||
.99
3
paving
1,774 LF
8
Masonry reflective paint, parking lines, etc
Paint ADA designated parking on pavement,
complete
6 EA
0.31
||content||
,682
2 LS
||content||
,078.10
,156
Interior signage allowance
5,339
Total C10 Interior Construction
Page 1