DOE-2 Energy Modeling Summary - Courthouse
Page 19 of 26
E.
UTILITY COSTS
Utility:
PEPCO
Service Class:
Time Metered General Service - Primary Service
Rate Schedule:
Schedule "GT-LV"
Distribution Service Charge
June-October
November-May
Summer
Winter
Customer Charge
.93
.93
Kilowatt-hour Charge
1.029 per kWh
1.029 per kWh
Kilowatt Charge
Maximum
.80 per kW
.80 per kW
Transmission Service Charge
Kilowatt-hour Charge
0.219 per kWh
0.219 per kWh
Kilowatt Charge
On Peak
-
Maximum
Generation Service Charge
Kilowatt-hour Charge
On Peak
2.253 per kWh
2.110 per kWh
Intermediate
2.253 per kWh
2.110 per kWh
Off Peak
2.253 per kWh
2.110 per kWh
Kilowatt Charge
On Peak
.41 per kW
-
Maximum
.70 per kW
.70 per kW
APPENDIX I - GSA LEED COST STUDY