MR
MATERIALS & RESOURCES
MR 2.1b
Waste management (divert 50%)
(Cases 2B, 4B, 6B)
Recycled Content Specify 10% PC or
MR 4.2
20% PC + PI
See Synergistic Item SN 2
Local/regional materials, 20%
MR 5.1b
manufactured locally Cases 2B, 4B, 6B)
Local/regional materials, of 20%
MR 5.2
manufactured locally/50% Harvested
See Synergistic Item SN 2
locally
Certified Interior wood doors
MR 7
See Synergistic Item SN 4
ENVIRONMENTA QUALITY
EQ
Environmental tobacco smoke (ETS)
EQ p2
control
Install CO2 sensors & 5-year
EQ 1
See Synergistic Item SN 1c
Construction IAQ Management Plan -
EQ 3.1
During Construction
Construction IAQ Management Plan -
EQ 3.2
Before Occupancy
Low-Emitting Materials, Composite
EQ 4.4
Wood - formaldehyde -free MDF
See Synergistic Item SN 4
Indoor chemical and pollutant source
EQ 5
control
Provide Operable in lieu of Fixed
EQ 6.1b
Windows at 15% of the Glazed Area
(Case 6B)
Thermal Comfort, Pneumatic
EQ 7.1a
atomizing humidifier
Thermal Comfort, Permanent
EQ 7.2
Monitoring System
Cost of this item in EQ 7.1a